Hi Guys,
After a bit of advice - taken off some blown plaster and want to dot and dab some plasterboard to patch it up. Only problem is, to get it level with the board next to it, it would need to be built up a bit (annoying not quite enough for two boards together).
I'd rather get it level before skimming than trying to build up the skim more on one side. Can hardwall (these are high suction walls) be used to build out the underneath brick work a little? and then just dot and dab on to the hardwall when dry?
Any advice is much appreciated.
After a bit of advice - taken off some blown plaster and want to dot and dab some plasterboard to patch it up. Only problem is, to get it level with the board next to it, it would need to be built up a bit (annoying not quite enough for two boards together).
I'd rather get it level before skimming than trying to build up the skim more on one side. Can hardwall (these are high suction walls) be used to build out the underneath brick work a little? and then just dot and dab on to the hardwall when dry?
Any advice is much appreciated.