In a split load CU, normally some mcb,s are on rcd side which need protection and others are on non rcd side. Phase and neutral leads are crossed from main incomer to rcd.
What about the busbar, is it supposed to be used as one piece or cut accordingly.
My sparky has done second fix today.
I have noticed four blanks are inserted in between rcd and non rcd side but buzbar is as one piece. Is it suppose to be like this. Board was supplied by me, MEM 2000 AD. Normally main switch is on right side but on mem boards it is on left side.
I had asked sparky to swap them over so cables comming from left underneath does not have to cross over the main tails, as meter was on right hand side. I was told by wholesaler that it could be switch over. Sparky says it can't be.
Swa cable for garage also comes from underneath which need glands. Meter tails are in way. Can we gland metal adaptable box below tails and use trunking to go underneath tails into CU.
What about the busbar, is it supposed to be used as one piece or cut accordingly.
My sparky has done second fix today.
I have noticed four blanks are inserted in between rcd and non rcd side but buzbar is as one piece. Is it suppose to be like this. Board was supplied by me, MEM 2000 AD. Normally main switch is on right side but on mem boards it is on left side.
I had asked sparky to swap them over so cables comming from left underneath does not have to cross over the main tails, as meter was on right hand side. I was told by wholesaler that it could be switch over. Sparky says it can't be.
Swa cable for garage also comes from underneath which need glands. Meter tails are in way. Can we gland metal adaptable box below tails and use trunking to go underneath tails into CU.