Our boiler and hot water tank is in the process of being moved up to the loft.
The Boiler circuit has been ran up to the loft already but not terminated as I was not 100% where the tank and boiler would end up located.
Now it's located on the gable end I know where I need to mount the various FCU's for the immersion and boiler supply.
I'm going to need to run the T+E up the wall to get to the boxes. Is it acceptable to clip the cable direct to the brickwork or do I have to run it in conduit, albeit plastic?
The Boiler circuit has been ran up to the loft already but not terminated as I was not 100% where the tank and boiler would end up located.
Now it's located on the gable end I know where I need to mount the various FCU's for the immersion and boiler supply.
I'm going to need to run the T+E up the wall to get to the boxes. Is it acceptable to clip the cable direct to the brickwork or do I have to run it in conduit, albeit plastic?