- Joined
- 17 May 2012
- Messages
- 10,791
- Reaction score
- 852
- Country
Had my loft conversion done, builder has finished. The carpets came and the fitter needed to remove the door, says 1/4 inch needs to be taken off the bottom. Is it normal to call a builder back to cut door and rehang, or would this be considered a separate job? If the latter, I will contact a local carpenter instead. Just wondering what is acceptable etc. - don't want my builder to think I am taking the ****! A second carpet comes on Friday and that might also need a shorter door (carpet not so thick this time).
If i get a carpenter, what would be a fair price for reducing 2 doors and re-hanging?
If i get a carpenter, what would be a fair price for reducing 2 doors and re-hanging?