What switchgear??
Sure many of you can help with this one?
I/we (my neighbour) co own a set of decent size outbuildings that are wired up and have distribution in place within the buildings. the buildings are fed by way of 16mm SWA cable that terminates in a secure/weathertight co owned by me and neighbour, communal lean to.
Basically we both have capasity and spare ways in our internal nearby distribution boards,
We both are going to run a supply to the secure lean to, and from there we want to be able to alternate who powers up the outbuildings, for instance if my neighbour is working on his little hobby overnight i/we want him to supply the power, and when i am doing what i do and he is away (which happens to both of us) he would want me to pay for the power.
I believe that a changeover switch is the answer to our quest (I am expecting many posts asking why we want to do this , and also giving alternative ways with use of meters ect, but this is both our preffered way)
So I beleieve a simple changeover swith with power 1 position, off position and power 2 position is the answer.
Anybody direct me to a product??
Many thanks Russell.
Sure many of you can help with this one?
I/we (my neighbour) co own a set of decent size outbuildings that are wired up and have distribution in place within the buildings. the buildings are fed by way of 16mm SWA cable that terminates in a secure/weathertight co owned by me and neighbour, communal lean to.
Basically we both have capasity and spare ways in our internal nearby distribution boards,
We both are going to run a supply to the secure lean to, and from there we want to be able to alternate who powers up the outbuildings, for instance if my neighbour is working on his little hobby overnight i/we want him to supply the power, and when i am doing what i do and he is away (which happens to both of us) he would want me to pay for the power.
I believe that a changeover switch is the answer to our quest (I am expecting many posts asking why we want to do this , and also giving alternative ways with use of meters ect, but this is both our preffered way)
So I beleieve a simple changeover swith with power 1 position, off position and power 2 position is the answer.
Anybody direct me to a product??
Many thanks Russell.