Hi, I've done a Search and although lots of people have this issue there doesn't seem to be an answer anywhere.
I have 95mm studs with 90mm pir insulation so pretty much flush. How do I run my cables?
Options I see are:
1/chase the pir out? (centre or on edge of stud?)
2/run externally on plasterboard
3/batten the walls to make a void
4/run externally under cladding and run through building
Only option 1 seems to make any sense to me?
Thanks.