Hi, I've got a partial collapse of a soil path due builders removing a concrete patio and laying tiles down
Is there a way of drilling the length of the pipe and inserting a liner. The collapse is about 1.5m from the exit. I've tried using the prong attachment on the rods but its hard getting enough purchase on the rod.
I am trying to avoid taking up the tiles but cant find a suitable flexy drill or pipe liners
Helllppppp
Is there a way of drilling the length of the pipe and inserting a liner. The collapse is about 1.5m from the exit. I've tried using the prong attachment on the rods but its hard getting enough purchase on the rod.
I am trying to avoid taking up the tiles but cant find a suitable flexy drill or pipe liners
Helllppppp