Quick query chaps,
My boss (I work with a 1 man band) has asked me to price a job up over the weekend as he thinks it will be good experience for me, the details are below to the best of my knowledge.
Remove Worcester High Flow 3.5 and vertical flue from cupboard and install new boiler into same position.
Supply and fit 440cdi with DT10RF optimiser and spirotrap.
4 x 1meter flue extension
1 x vertical terminal
1 x pitched roof flashing
3 x 22mm copper pipe
1 x 15mm copper
Various solder fittings/compression fittings
Connect condensate to drain under the property (easy access once floor is opened)
Flush with cleanser X800
Add inhibitor X100
I've got a price in my head now but not sure how accurate I am with this, My boss will still be pricing but I want to be as realistic as poss.
Cheers
My boss (I work with a 1 man band) has asked me to price a job up over the weekend as he thinks it will be good experience for me, the details are below to the best of my knowledge.
Remove Worcester High Flow 3.5 and vertical flue from cupboard and install new boiler into same position.
Supply and fit 440cdi with DT10RF optimiser and spirotrap.
4 x 1meter flue extension
1 x vertical terminal
1 x pitched roof flashing
3 x 22mm copper pipe
1 x 15mm copper
Various solder fittings/compression fittings
Connect condensate to drain under the property (easy access once floor is opened)
Flush with cleanser X800
Add inhibitor X100
I've got a price in my head now but not sure how accurate I am with this, My boss will still be pricing but I want to be as realistic as poss.