Can sum 1 describe to me the correct method of flushing and charging the system safely when commissioning.
Describe the method of checking the differential temperatures of flow and return pipe work given that the differential temperature is 11 c
What is the importance of the by-pass valve connecting flow and return, and describe how to set this.
Describe the method for testing the whole system for soundness when commissioning the system
Describe the method of checking the differential temperatures of flow and return pipe work given that the differential temperature is 11 c
What is the importance of the by-pass valve connecting flow and return, and describe how to set this.
Describe the method for testing the whole system for soundness when commissioning the system