Hi

I am in the process of having a conservatory built and will need to level the floor with self levelling compound.

The concrete base was installed in early March but because of lockdown the conservatory walls and roof were not completed until 20th July meaning the base was left open to the weather until that date.

The question I have is how long do I have to leave the base before applying primer / self levelling compound.

Thanks
 
Sponsored Links
Be worth checking the floor has fully dried from rainfall- put a bit of dpm on the floor, put something heavy on it (bag of cement is ideal), leave overnight. If under the dpm is damp when you lift it, leave it a bit longer before sealing
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top