Hi all,
Got a ground floor flat with concrete ceilings. The current wiring is done using some kind of cabling Ive not come across before. (See pic) 2 core, live and neutral, no earth.
So assuming this will fail to pass an eicr as it stands.
The cable it appears has been cast into the concrete during the build.
What are options for concealing the cable for the rewire? Conduit stuck to the ceiling will really spoil the look of the place and will be an eyesore.
Dropping the ceiling involves a lot of work with studding out and plasterboard.
What are thoughts on chasing cable within the ceiling? Any safe way to do this?
Thanks.
Got a ground floor flat with concrete ceilings. The current wiring is done using some kind of cabling Ive not come across before. (See pic) 2 core, live and neutral, no earth.
So assuming this will fail to pass an eicr as it stands.
The cable it appears has been cast into the concrete during the build.
What are options for concealing the cable for the rewire? Conduit stuck to the ceiling will really spoil the look of the place and will be an eyesore.
Dropping the ceiling involves a lot of work with studding out and plasterboard.
What are thoughts on chasing cable within the ceiling? Any safe way to do this?
Thanks.