Hi,
I just ordered a new shed which is 2.35*1.75 and I need to put down a concrete slab as a base, before I put down the bearing and floor etc. The shed will not house too many heavy items.
I am planning on putting down a 3.55 * 1.95 * 0.1 slab. I understand that I need to create a frame using 18mm ply and put down a dpm, then fill it up with concrete.
What is the best way to mix up concrete?
What is the best mix/ratio for my purposes?
Is it best to mix it up in batches in a rented concrete mix machine then pour it in?
How long will it take me to do, if I am by myself?
thanks!!!
I just ordered a new shed which is 2.35*1.75 and I need to put down a concrete slab as a base, before I put down the bearing and floor etc. The shed will not house too many heavy items.
I am planning on putting down a 3.55 * 1.95 * 0.1 slab. I understand that I need to create a frame using 18mm ply and put down a dpm, then fill it up with concrete.
What is the best way to mix up concrete?
What is the best mix/ratio for my purposes?
Is it best to mix it up in batches in a rented concrete mix machine then pour it in?
How long will it take me to do, if I am by myself?
thanks!!!