I wonderd if any one can help me with a question for gas meter removal on my nvq level 3 in plumbing. When applying temporary continuity bonding on the pipe work before removing the meter. Do I place the continuity bonding on the upstream side on the meter( side with ecv on) the the downstream side. And disconnect in reverse order? Thank you