My friend has a cloakroom which had a lower floor than the rest of the house (step down) and pipes running along the wall boxed in.
He's had the floor screeded to the same level as the house, pipes were protected by the boxing.
Now, when removing the boxing, the pipes are just about 5mm lower than new screed.
Is there a solution to run floor tiles all over and avoid having to box the pipes in?
In other words, is there a method to support the last 50/60mm of the tiles?
The 4 copper pipes run one next in 2 rows.
Thanks
He's had the floor screeded to the same level as the house, pipes were protected by the boxing.
Now, when removing the boxing, the pipes are just about 5mm lower than new screed.
Is there a solution to run floor tiles all over and avoid having to box the pipes in?
In other words, is there a method to support the last 50/60mm of the tiles?
The 4 copper pipes run one next in 2 rows.
Thanks