I'm in the process of prep'ing a concrete sub floor. I just want to make sure I've done everything correctly before the self levelling.
The concrete has quite a few cracks in it, which are also high points. So I've been grinding these down which has opened them up a bit and they will now need filled. Can I fill them with regular mortar or do I need to use something else for better results?
Also, do I need to leave an expansion gap around the edge of the room for the self levelling compound or just make sure it's all sealed off so that the compound can't run out?
Last thing... should I PVA the floor first?
I've been reading around and I'm getting some conflicting opinions about the above.
The self levelling compound instructions don't really offer much help either. It's the No - Nonsense stuff from screwfix.
The concrete has quite a few cracks in it, which are also high points. So I've been grinding these down which has opened them up a bit and they will now need filled. Can I fill them with regular mortar or do I need to use something else for better results?
Also, do I need to leave an expansion gap around the edge of the room for the self levelling compound or just make sure it's all sealed off so that the compound can't run out?
Last thing... should I PVA the floor first?
I've been reading around and I'm getting some conflicting opinions about the above.
The self levelling compound instructions don't really offer much help either. It's the No - Nonsense stuff from screwfix.