Hiya,
My build has 3x single steps in different parts; one up as you enter the garden from the front gate, then one down to a lower platform, then one up to the back garden gate.
I'm not sure whether to sit the first tread flush with the 'down' board or have a slight over hang, maybe 20mm or something; ie the width of one of the grooves in the Travis decking I have.
Is there a recommendation (must do's and must not do's) or is just whatever you'd prefer?
My build has 3x single steps in different parts; one up as you enter the garden from the front gate, then one down to a lower platform, then one up to the back garden gate.
I'm not sure whether to sit the first tread flush with the 'down' board or have a slight over hang, maybe 20mm or something; ie the width of one of the grooves in the Travis decking I have.
Is there a recommendation (must do's and must not do's) or is just whatever you'd prefer?