Hi again,
Opinions please as I may have made a mistake.
Just had downstairs lights rewired while have the loft conversion done.
Anyway lighting circuit run in 1mm and clipped to ceilling joists. Very neat job, but the joists will have to be packed with insulation therefore all the cables will be covered in insulation.
So I suggested to the electrician that the circuit will need to be derated and should maybe be run in 2.5 (if I have read the details correctly).
Can anyone tell me if I am correct?
Everything about this job is becoming a nightmare!
Many thanks.
Neil
Opinions please as I may have made a mistake.
Just had downstairs lights rewired while have the loft conversion done.
Anyway lighting circuit run in 1mm and clipped to ceilling joists. Very neat job, but the joists will have to be packed with insulation therefore all the cables will be covered in insulation.
So I suggested to the electrician that the circuit will need to be derated and should maybe be run in 2.5 (if I have read the details correctly).
Can anyone tell me if I am correct?
Everything about this job is becoming a nightmare!
Many thanks.
Neil