Hi guys...
I'm digging my garden up to build a driveway.
My garden measures 7.5m x 8.5m and I want to dig down 200mm.
This works out at 12.75m³ which I worked out to be just short of 14yds³, so would fit in a 16 yd skip...
But, I've been told that when I dig it up, and it's no longer compacted, that it will more likely be 18 or 19yds³, is this right?
I don't want to hire a 16 yard skip and then have to get a 4 yard skip as it may be cheaper to get two 10 yarders? (If they do 10's)
Any thoughts?
Thanks in advance
I'm digging my garden up to build a driveway.
My garden measures 7.5m x 8.5m and I want to dig down 200mm.
This works out at 12.75m³ which I worked out to be just short of 14yds³, so would fit in a 16 yd skip...
But, I've been told that when I dig it up, and it's no longer compacted, that it will more likely be 18 or 19yds³, is this right?
I don't want to hire a 16 yard skip and then have to get a 4 yard skip as it may be cheaper to get two 10 yarders? (If they do 10's)
Any thoughts?
Thanks in advance