I live in a small three bed semi in south Kent, and have had a quote for some plumbing work, mainly:
Drain down CH system
To 'flip' a rad from one side of the room to the other (2m)
To connect two other wall-mounted rads to the existing CH (about 2-3m from existing pipes)
To run H and C down from loft, to airing cupboard, then under floorboards for new batheroom (floorspan about 6 metres), and provide pipes up for basin, bath and toilet.
All in copper piping.
£895 inc VAT
Any thoughts?