I have had a new single story extension built.
Drainage for a new downstairs toilet has been installed. The origianl manhole was relocated (as it would have been in the extension) and a new run for the downstairs toilet was made directly to the new manhole (this is only servicing the toilet and nothing else). At the moment I have the underground pipe coming up vertically through the floor inside the cloakroom.
How do I connect this to my toilet when I install it? Does it need to be vented in anyway?
Thanks
Drainage for a new downstairs toilet has been installed. The origianl manhole was relocated (as it would have been in the extension) and a new run for the downstairs toilet was made directly to the new manhole (this is only servicing the toilet and nothing else). At the moment I have the underground pipe coming up vertically through the floor inside the cloakroom.
How do I connect this to my toilet when I install it? Does it need to be vented in anyway?
Thanks