DPC/DPM Detail

Joined
18 Feb 2015
Messages
1
Reaction score
0
Location
Blackpool
Country
United Kingdom
A DPM must be provided under the proposed flooring and lapped up to the DPC; this should be applied to the top of the existing slab and lapped up.

is the following detail correct for the above statement?

many thanks

 
Sponsored Links
Sponsored Links
The foundations are too narrow and not deep enough, the floor slab is too thin and the floor detail (wood and chipboard!) and timber internal wall (no sheathing, VCL, breather etc) are pants.

Looks like an amateurs job at a crappy conservatory detail to me.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top