Anyone know how long it might take for my 150mm thick and 2.5m by 4.8 m floor slab will take to dry sufficiently for me to lay my laminate?
I will be laying it on a 3mm foam type of underlay although this isn't a dpm, as I already have that in the floor construction.
Should i still lay another dpm on top of the slab before the laminate or just go with the 3mm foam underlay??
I will be laying it on a 3mm foam type of underlay although this isn't a dpm, as I already have that in the floor construction.
Should i still lay another dpm on top of the slab before the laminate or just go with the 3mm foam underlay??