Hi, digging 3trenches perpendicular to a wall, these will be deep filled so consider that majority material will be removed. Am doing this on own with a mini digger

is there commonly a best placing for a dump site for a dig like this that will save most time. Consider that will not dump between trenches. :)
 
Sponsored Links
We lay a heavy duty lorry tarp and about 10 sheets of 18mm ply on top to form a grabloader 'station' where all the spoil is heaped, in a grab accessible location.

Make sure that your water stop tap (in the road or footpath) is in good working order before digging and familiarise yourself with gas, electricity and drain runs.

don't forget to dig off the oversite as you come back with the trench dig as you wont be able to do this after digging the trenches. You may however plan on getting over once the concrete has set, but this may mean hiring a digger for longer than necessary.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top