Had a new gas hob fitted and installer pointed out that gas supply was not earth bonded within 600mm of meter. From the meter there is approx 2metres of lead pipe which then joins to copper where the earth wire is attached.
Some questions ....
Is it possible to bond to lead pipe or will I need to have the lead replaced with copper?
Is the actual bonding a plumber or electricians job, or is it a diy job?
Some questions ....
Is it possible to bond to lead pipe or will I need to have the lead replaced with copper?
Is the actual bonding a plumber or electricians job, or is it a diy job?