Hi,
I'm carrying out a rewire of my property - as I'm doing the work in stages (mainly room by room) it means alot of trips out for my BCO as he can't just do a single first fix visit and then 2nd fix and inspection of my tests (which he has already specified is how he wants to do it).
Special locations aside, is there anything to stop me wiring a single socket to a room as a RFC, carrying out test and inspection, getting it signed off, then adding sockets as and where I see fit closer to the time (in accordance with the regs) when I move onto that room?
I get the feeling I can't, but since the addition of socket outlets isn't notifiable I'm not sure why....
Cheers,
I'm carrying out a rewire of my property - as I'm doing the work in stages (mainly room by room) it means alot of trips out for my BCO as he can't just do a single first fix visit and then 2nd fix and inspection of my tests (which he has already specified is how he wants to do it).
Special locations aside, is there anything to stop me wiring a single socket to a room as a RFC, carrying out test and inspection, getting it signed off, then adding sockets as and where I see fit closer to the time (in accordance with the regs) when I move onto that room?
I get the feeling I can't, but since the addition of socket outlets isn't notifiable I'm not sure why....
Cheers,