Have run out of connection points for earth termination at the MET. Currently using an 8 way block with mainly 10mm cables going in and one final 16mm earth cable out to the (old MEB) incoming earthing point.
Can I double up on this block with a second 8 way block and loop a 10mm earthing cable or 16mm to join the two to make a 16 way earth termination point.
Have searched for domestic earthing blocks, but they only seem to go up to 8 connections.
Advice appreciated.
Can I double up on this block with a second 8 way block and loop a 10mm earthing cable or 16mm to join the two to make a 16 way earth termination point.
Have searched for domestic earthing blocks, but they only seem to go up to 8 connections.
Advice appreciated.