I have just fitted a new bath with a mixer tap and now noticed when filling the bath the f&e tank overflows. The cold is mains fed with hot water from the cylinder.
My boiler is a Thorn M30/42b and a Coppermatic Cylinder c/w f&e tank above.
Any ideas what I can do to solve this??
Thanks in advance
My boiler is a Thorn M30/42b and a Coppermatic Cylinder c/w f&e tank above.
Any ideas what I can do to solve this??
Thanks in advance