I'm using Fiscner basin fixing bolts to attach a wall mounted basin to a stud wall I've constructed.
Any idea what size of 'pre-drill' I should use before screwing the M10 studs in?
Any idea what size of 'pre-drill' I should use before screwing the M10 studs in?