Ive dug 200mm down for my patio base and water is building up on the clay and as you can imagine so areas and very boggy. Can I still fill it with my 100mm of scalpings or does it need to dry out first?
I've bailed the water out from 2 separate puddles. The ground is now just very squelchy underfoot. Is this ok to fill with sub base or do I need to leave it still?