Hi,
I’ve recently knocked three rooms into one making the living room/diner into a kitchen/diner and incorporated the existing utility room into the kitchen diner also. However, the floor levels (made from concrete) are completely off between the three areas in the kitchen / diner - the utility room floor is around an inch higher than the kitchen floor.
How would I go about fixing this? Would my best bet be to chip away at the surface of the utility floor to bring it below the kitchen floor level and pour a load of self level into the area?
Any advice appreciated
Thanks
I’ve recently knocked three rooms into one making the living room/diner into a kitchen/diner and incorporated the existing utility room into the kitchen diner also. However, the floor levels (made from concrete) are completely off between the three areas in the kitchen / diner - the utility room floor is around an inch higher than the kitchen floor.
How would I go about fixing this? Would my best bet be to chip away at the surface of the utility floor to bring it below the kitchen floor level and pour a load of self level into the area?
Any advice appreciated
Thanks