Hi All,
A second question concerning screeding my floor. The area is about 15m2 @ 65mm thickness.
What will the impact if I cannot complete the job in a day and need to spread the work into two days? I decided to do the work myself as all quotes I have for completion are 2 man/1 day job @£200 per man totalling £400 which seems steep.
The finished floor will be laid with slate tiles which will be put down with a very strong tile adhesive - I put the same stuff down in the kitchen and it is strong stuff.
Regards
Adrian