Hi guys im digging my footings ready for mas fill on tuesday.
I have dug 1metre down and hit clay... anyway i dug a vit deeper the clay is only 100 mm thick and then it turns into like a crushed up coal with random bits of vroken pottery.
This is next to the the footings on a 1930s house but they just keep going. I gotto 1.8 metres and still this weird stuff.
Not sure what do if i hadnt dug any
more id be none the wiser because its clay at a metre.
B.c are coming tuesday but not sure what todo its only a single story extension and can see it getting expebsive now!
Is pilling going be an option? cheers
I have dug 1metre down and hit clay... anyway i dug a vit deeper the clay is only 100 mm thick and then it turns into like a crushed up coal with random bits of vroken pottery.
This is next to the the footings on a 1930s house but they just keep going. I gotto 1.8 metres and still this weird stuff.
Not sure what do if i hadnt dug any
more id be none the wiser because its clay at a metre.
B.c are coming tuesday but not sure what todo its only a single story extension and can see it getting expebsive now!
Is pilling going be an option? cheers