Hi all,
Great forum, and can usually easily find what I want to know!
However, I'm unsure on this one so here goes...
I've just removed a bathroom radiator succesfully (well, wet but succesful )
Now..... I will be replacing the radiator in the futre with a heated towel rail and I am only currently left with the pipes. The pipes will need to be shortened to accomodate the towel rail eventually.
But... the pipes run across the front of the skirting board which I need to remove as I am also laying laminate flooring and need to get some levelling down.
So, the question is....
How do I go about cutting then capping the pipes so that
a) I can remove the skirting without bending /breaking the pipes and
b) I can extend / use them later for the heated towel rail.
Thanks in advance, appreciated!
Great forum, and can usually easily find what I want to know!
However, I'm unsure on this one so here goes...
I've just removed a bathroom radiator succesfully (well, wet but succesful )
Now..... I will be replacing the radiator in the futre with a heated towel rail and I am only currently left with the pipes. The pipes will need to be shortened to accomodate the towel rail eventually.
But... the pipes run across the front of the skirting board which I need to remove as I am also laying laminate flooring and need to get some levelling down.
So, the question is....
How do I go about cutting then capping the pipes so that
a) I can remove the skirting without bending /breaking the pipes and
b) I can extend / use them later for the heated towel rail.
Thanks in advance, appreciated!