Hi All,
I would really appreciate some thoughts on the quote below, we've requested 6 quotes and only received one and now I have pressure from the wife to get it yesterday:
- Sheet and plaster wall & ceiling, 8 down-lighters and fit extractor fan. Room is 3.5m x 2m and the plastering is only around 5m2 = £1310
- Fit bathroom suite & shower (units supplied by client), adjust pipework as necessary, fit new window, sheet and tile floor, 4 down lighters, extractor fan, make good plaster, tile bath area only = £3650 . Room is 2m x 1.8m.
- (Structural wall already removed and plastered in this current bathroom) - Make good plaster (10m2), disconnect suite, make good the floor under bath and box in pipes and make good. = £1830 .
- New soil vent pipe - Dig trench - 2.5m out to pipe and to 1m depth and make connection = £1250 .
Any help greatly appreciated!
I would really appreciate some thoughts on the quote below, we've requested 6 quotes and only received one and now I have pressure from the wife to get it yesterday:
- Sheet and plaster wall & ceiling, 8 down-lighters and fit extractor fan. Room is 3.5m x 2m and the plastering is only around 5m2 = £1310
- Fit bathroom suite & shower (units supplied by client), adjust pipework as necessary, fit new window, sheet and tile floor, 4 down lighters, extractor fan, make good plaster, tile bath area only = £3650 . Room is 2m x 1.8m.
- (Structural wall already removed and plastered in this current bathroom) - Make good plaster (10m2), disconnect suite, make good the floor under bath and box in pipes and make good. = £1830 .
- New soil vent pipe - Dig trench - 2.5m out to pipe and to 1m depth and make connection = £1250 .
Any help greatly appreciated!