Hello all
I'm wondering if anyone can help with this. I am trying to work out if I can add an additional shower to an existing system. Basically the premises is a bungalow with two bathrooms, one has a shower (pumped) and the other has a bath. The hot water cylinder is standard size for the building. I want to know if there are any special considerations before I install a 2nd shower over the bath and what the best place to connect the hot supply for shower would be?
Much appreciated in advance.
I'm wondering if anyone can help with this. I am trying to work out if I can add an additional shower to an existing system. Basically the premises is a bungalow with two bathrooms, one has a shower (pumped) and the other has a bath. The hot water cylinder is standard size for the building. I want to know if there are any special considerations before I install a 2nd shower over the bath and what the best place to connect the hot supply for shower would be?
Much appreciated in advance.