Hi all,
I have just purchased a 3 bed semi. I knew that the house would need rewiring as it has some old rubber coated cables, and braided cables from the ceiling rose and also round light sockets.
The wiring looks as if it has been added to over the years and is now in need of attention.
I was just wondering if anybody could tell me the length of time I should expect for an electrician to rewire the house.
I will be channeling where the wires need to go and cutting the holes so that the wall sockets can be flush mounted.
This would leave the electrician the following :-
1. install new consumer unit
2. upgrade meter tails
3. upgrade main earth
4. install 19 double sockets
5. install 2 single sockets
6. install 11 lighting points
7. install 2 2way lighting switch
8. install 1 cooker switch
9. install 1 spur
Thanks in advance
Paul
I have just purchased a 3 bed semi. I knew that the house would need rewiring as it has some old rubber coated cables, and braided cables from the ceiling rose and also round light sockets.
The wiring looks as if it has been added to over the years and is now in need of attention.
I was just wondering if anybody could tell me the length of time I should expect for an electrician to rewire the house.
I will be channeling where the wires need to go and cutting the holes so that the wall sockets can be flush mounted.
This would leave the electrician the following :-
1. install new consumer unit
2. upgrade meter tails
3. upgrade main earth
4. install 19 double sockets
5. install 2 single sockets
6. install 11 lighting points
7. install 2 2way lighting switch
8. install 1 cooker switch
9. install 1 spur