Hi - looking to build a 3 brick high retaining wall - intended it to be 2 wide eithba solider course on the top - it will be approx 8m long
How deep should I go with the footings ??
It is to replace existing sleeper holding back grass, although I’m going to move grass towards house (sleepers have been replaced a couple of years back and have never moved )
How deep should I go with the footings ??
It is to replace existing sleeper holding back grass, although I’m going to move grass towards house (sleepers have been replaced a couple of years back and have never moved )