How many tonnes of Type 1 Ag. and Asdug to 1 cubic metre?

Joined
6 Apr 2006
Messages
32
Reaction score
0
Location
Glasgow
Country
United Kingdom
Hello...

Two questions....

(1) - If I had a 1 cubic metre hole and I wanted to fill it with Type 1 aggregate (compacted down!), how many tonnes would I need?

(2) - If I had a 1 cubic metre hole and I wanted to fill it with Asdug (compacted down!), how many tonnes would I need?

Any info assisting me in calculating tonnage of these materials based on their cubic metre volume would be very appreciated.

Thanks
 
Sponsored Links
a cubic metre hole would require about 1.8 tonnes of compacted stone to fill it.

never heard of asdug?

we just order bulk loads of mot direct from a haulier. i will look at a site and gauge it by eye plus some extra. we always stone up the site perimeter so that bricklaying and walking the site is easier, so any stone left over goes around the outside.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top