(1) - If I had a 1 cubic metre hole and I wanted to fill it with Type 1 aggregate (compacted down!), how many tonnes would I need?
(2) - If I had a 1 cubic metre hole and I wanted to fill it with Asdug (compacted down!), how many tonnes would I need?
Any info assisting me in calculating tonnage of these materials based on their cubic metre volume would be very appreciated.
Thanks