you will have a filling loop flexible hose somewhere, remove the cap and place it between the valves as shown, open both valves till pressure is between 1.0 Bar and 1.5 Bar, then close both valves and remove the hose again and refit the blanking cap
you will have a filling loop flexible hose somewhere, remove the cap and place it between the valves as shown, open both valves till pressure is between 1.0 Bar and 1.5 Bar, then close both valves and remove the hose again and refit the blanking cap
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local