Hi
Our plans have asked for insulation before plastering. The building is built out of 215mm blocks and the shell is up. I cant believe that we cant just plaster the walls
So my question is being that this is built with blocks and we require insulation, what sort of stud work needs to go up to take the insulation ect?
Thanks
Nelliedee
Our plans have asked for insulation before plastering. The building is built out of 215mm blocks and the shell is up. I cant believe that we cant just plaster the walls
So my question is being that this is built with blocks and we require insulation, what sort of stud work needs to go up to take the insulation ect?
Thanks
Nelliedee