After reading a few posts on here recently about bonding of pipes i decided to look at how my kitchen pipes were bonded.
They have earth clamps with the "do not remove" tag and have 6mm earth wire connected to each pipe and then I've followed it back to connnection in an earth terminal in the CU.
Now correct me if I'm wrong but I believe this is incorrect. Or have i got the wrong end of the stick, how should this be done?
Cheers
They have earth clamps with the "do not remove" tag and have 6mm earth wire connected to each pipe and then I've followed it back to connnection in an earth terminal in the CU.
Now correct me if I'm wrong but I believe this is incorrect. Or have i got the wrong end of the stick, how should this be done?