Can anyone comment on whether this is a fair or decent price for a complete bathroom refurb on a house circa 1930s. This is in Havering, effectively Greater London.
I removed the tiles before the job started, which were two layers thick and after I'd finished the walls needed redoing.
Entire cost for bathroom 3m x 2.7m - £3,280.
All materials below were part of the bill except bath, sink, shower, taps, radiator and mirror which we bought beforehand.
- Plastering of four walls and ceiling skimmed
- Disconnection and removal of old bath and shower, sink and toilet.
- Removal of old box work and underlying pipes in corner
- New pipework for shower and bath, excavated into walls for wall mounted taps and shower. Pipes run to downstairs boiler
- Tile and four walls, toilet/sink stud box and bath panels. (large tiles and mosaic type)
- Tile and seal floor (large slate tiles)
- Build out timber stud frame for wall hanging sink and toilet.
- Fit wall hung toilet, moving position 3 feet. Required external soil pipe extension to drain, hole cut to outside wall for soil pipe (on top of a lean-to). Old soil pipe hole filled and plastered.
- Fit wall hung sink
- Build timber frame for bath, fit bath
- Fit shower and screen
- Run wiring and fit 4 new down lights from loft. remove old light and fill cavity
- Run wiring and fit electric light mirror
- Fit new pressure valve to boiler downstairs to increase temperature.
- Install wall hung radiator in new position and remove old radiator
- Fit toilet paper holder, towel rail, 2 x towel hooks, shelf.
I removed the tiles before the job started, which were two layers thick and after I'd finished the walls needed redoing.
Entire cost for bathroom 3m x 2.7m - £3,280.
All materials below were part of the bill except bath, sink, shower, taps, radiator and mirror which we bought beforehand.
- Plastering of four walls and ceiling skimmed
- Disconnection and removal of old bath and shower, sink and toilet.
- Removal of old box work and underlying pipes in corner
- New pipework for shower and bath, excavated into walls for wall mounted taps and shower. Pipes run to downstairs boiler
- Tile and four walls, toilet/sink stud box and bath panels. (large tiles and mosaic type)
- Tile and seal floor (large slate tiles)
- Build out timber stud frame for wall hanging sink and toilet.
- Fit wall hung toilet, moving position 3 feet. Required external soil pipe extension to drain, hole cut to outside wall for soil pipe (on top of a lean-to). Old soil pipe hole filled and plastered.
- Fit wall hung sink
- Build timber frame for bath, fit bath
- Fit shower and screen
- Run wiring and fit 4 new down lights from loft. remove old light and fill cavity
- Run wiring and fit electric light mirror
- Fit new pressure valve to boiler downstairs to increase temperature.
- Install wall hung radiator in new position and remove old radiator
- Fit toilet paper holder, towel rail, 2 x towel hooks, shelf.