I have taken down the old side wall of my house to open up my new extension.
My question is how do i join the new concrete slab floor to the old suspended timber floor across the cavity of the old wall.
I still have to lay the screed so the slab is still slightly lower.
Thanks
My question is how do i join the new concrete slab floor to the old suspended timber floor across the cavity of the old wall.
I still have to lay the screed so the slab is still slightly lower.
Thanks