Had a new bathroom installed last year. The joists had wet rot so the installer made a 'repair'
Been under the floor today to see if I could route a cable under the bathroom to repair the CH they borked.
They've sawn off the rotten bit overlapped timber the same size and screwed it into the side.
As far as i am concerned such a joint should be supported? Propped up level with blocks laid down the hard ground?
Been under the floor today to see if I could route a cable under the bathroom to repair the CH they borked.
They've sawn off the rotten bit overlapped timber the same size and screwed it into the side.
As far as i am concerned such a joint should be supported? Propped up level with blocks laid down the hard ground?