on a rewire 4 bed house We have used a junction box instead of ceiling rose above sunroom ceiling . we have taken the light drop through wall to outside light sl goes to 2g light switch other switch controlling light in sunroom .live neutral go on from jb to next light in kitchen all 1.5mm
all standard stuff I thought until I was told jbs have to be accessible which it is not
is the above good and will the nice man from niceic accept it. I was hoping to use this job as an example of work for assessment part P.
i think I would now bring my neutral down into the switch and chock block to the return neutral from the lamp
should I make niceic inspector aware of deviation and show how I would get around it in future
will he give me some sort of improvement order like corgi do
will he fail me
should i find another job to show him [/code]
all standard stuff I thought until I was told jbs have to be accessible which it is not
is the above good and will the nice man from niceic accept it. I was hoping to use this job as an example of work for assessment part P.
i think I would now bring my neutral down into the switch and chock block to the return neutral from the lamp
should I make niceic inspector aware of deviation and show how I would get around it in future
will he give me some sort of improvement order like corgi do
will he fail me
should i find another job to show him [/code]