Is there a particular knack to building a 2 metre high single story cavity wall?
I intend raising the outer leaf brickwork around 500mm ahead of the inner block work, and will push the cavity bats onto the wall ties before raising the blockwork.
It's a small extension and there are so many windows, doors, corners, etc that I doubt I'll get many uncut cavity bats in, if that's relevant.
Thanks
Gary
I intend raising the outer leaf brickwork around 500mm ahead of the inner block work, and will push the cavity bats onto the wall ties before raising the blockwork.
It's a small extension and there are so many windows, doors, corners, etc that I doubt I'll get many uncut cavity bats in, if that's relevant.
Thanks