The room size is about 8.5m x 5m and interrupted in the middle by a large chimney breast.
How do I level the concrete off/tamp it down since the existing walls prevent me and a helper from standing on either side of the floor with a long timber batten as you would do if you were laying a virgin slab outside?
Or do I lay the concrete slab in sections but even if I do this, how do I level off the concrete close to the walls?
Many thanks
How do I level the concrete off/tamp it down since the existing walls prevent me and a helper from standing on either side of the floor with a long timber batten as you would do if you were laying a virgin slab outside?
Or do I lay the concrete slab in sections but even if I do this, how do I level off the concrete close to the walls?
Many thanks