evening all, question if you don't mind.
lead flashing to dormer cheeks, the pitch of the roof is 40 degrees with composite slate, the dormer is having cedral weatherboard, when I re tile to the dormer cheeks do I have to use soakers and flashing or can I use aluminium soakers and no flashing on the rake. The front of the dormer needs flashing is 225mm lead wide enough code 4 or do I need to go wider, any help would be great, thank you.
lead flashing to dormer cheeks, the pitch of the roof is 40 degrees with composite slate, the dormer is having cedral weatherboard, when I re tile to the dormer cheeks do I have to use soakers and flashing or can I use aluminium soakers and no flashing on the rake. The front of the dormer needs flashing is 225mm lead wide enough code 4 or do I need to go wider, any help would be great, thank you.