- Joined
- 26 Jul 2015
- Messages
- 242
- Reaction score
- 4
- Country
Doing a refit on the kitchen and I've got some damp spots that have eaten away at Lino.
This area is a tad damp so thinking what would be the best option here before new base units go in and the flooring.
I am looking at a Click LVT flooring as target material.
Is the area of damage going to be fine with a underlay before the LVT?
Self level compound an option just in this particular spot?
This area is a tad damp so thinking what would be the best option here before new base units go in and the flooring.
I am looking at a Click LVT flooring as target material.
Is the area of damage going to be fine with a underlay before the LVT?
Self level compound an option just in this particular spot?