- Joined
- 24 Dec 2013
- Messages
- 27
- Reaction score
- 0
- Country
the builder, now bust, twice messed up the installation of the fire window in the gable wall of my loft conversion - size & height above floor.
i posted regarding above in "building regulations" part of the forum & after contacting my local BR depy they said a step would be accepted to allow for the floor height (size is ok).
however my only problem now is that the window is offset in the lintel by 1/2 a brick.
can anybody suggest a easy fix?
i posted regarding above in "building regulations" part of the forum & after contacting my local BR depy they said a step would be accepted to allow for the floor height (size is ok).
however my only problem now is that the window is offset in the lintel by 1/2 a brick.
can anybody suggest a easy fix?